Road Operation System along Cannel of Dau Tieng Irrigation System

Subproject Modernization of Dau Tieng irrigation system is implemented to repair and upgrade the head works and the two main channel, the east, west of Dau Tieng irrigation system, ensuring transport enough water for more than 115,000ha. Besides, reinforcing, building, and supplementing system- channels with level 1, 2, 3, serving 57,000ha of irrigation for the entire Tay Ninh Province.

Truong Thinh Construction Investment and Trading Joint Stock Company involved 05 construction bidding packages; workload includes concreting soil canal systems and improvement, renewing road operation along the canal bank.

Red graveled road on channel with level 1 in Duong Minh Chau District

Road along channel bank with level 1before construction of road surface structure.

0/5
(0 nhận xét)
  • 0% | 0 comments
  • 0% | 0 comments
  • 0% | 0 comments
  • 0% | 0 comments
  • 0% | 0 comments

Chia sẻ nhận xét về sản phẩm

Gửi nhận xét
GỬI ĐÁNH GIÁ CỦA BẠN
Đánh giá
Gửi