Other news

Sao Mai Resort Project – A shining pearl among the mountains and forests of Thanh Hoa province.

Sao Mai Resort – An international - class resort located in the west of Thanh Hoa province invested by Sao Mai Group on a total area of more than 53 hectares with an investment capital of nearly VND 1,500 bilion. It is a high-class ecological resort imbued with regional curture, friendly with the environment, owning the scenery “green mountains, charming blue water” of Thanh Hoa’s mountains and rivers. It is expected that when Sao Mai Resort is put into operation, it can serve 1,200 guests. With a gold location, only 10 km from Tho Xuan Airport, about 1 km from Lam Kinh Special National Monument; convenient when traveling by road and by airway, this place promises to be an attractive destination for domestic and foreign tourists.

Vietfish 2023 - A bright spot sowing the hope for Vietnam’s seafood industry

Recently, on August 23-25, Vietfish 2023 – Vietnam's largest seafood fair was held at SECC - Saigon Exhibition and Convention Center with a monumental and professional scale with the international level. This event gathered 220 exhibitors, more than 420 booths from 14 countries

Truong Thinh Corp introduces a new Company Profile

With the main color tone that is white, blue and red inspired by the brand logo, it is familiar but not old, creating a harmonious, elegant and modern combination, the layout arrangement goes from overview to specific details, all images are carefully selected from the marketing team during the time 2 months

VIETFISH 2023 IS COMING, ARE YOU READY

As an international exhibition event, over 24 years, VIETFISH has been recognized as a prestigious high-quality trade channel, helping Vietnamese and international enterprises to connect, exchange business experience and open for new cooperation opportunities. Following the previous success, Vietfish 2023 exhibition will continuously be a professional, high-class one and converging all the elite of the Vietnamese and international seafood industry.

How to building of the factory and things to know

Things business owners pay attention when building workshops.
 
1. What do you need to build a workshop?
- What is the area for building the workshop?
- What space will you devote to the construction of the workshop?
- How long do you want to build the workshop?
- What are the specific requirements for building a workshop?

This is the questions you have to answer when you intend to build  new factory for your company 
2. How do you choose a construction company?
Here are some criteria you can choose from.
- Have experience in building similar factory
- Have experience in design and construction.
- Having expert consultants with knowledge and experience.
- Good understanding of materials used for construction.
- Time of completion of standard works
3. What is the price of the workshop?
This is the decisive factor. In fact, the tendency to supply more than the current demand, construction contractors tend to race each other to win the bid. 
However, in construction, cheap is not necessarily a good thing, as you accept the price of the contractor is based largely on the budget you set. 
And above all, the price of the package will go with the best construction plan for your factory.
4. How to build a workshop?
Understanding the process of building a workshop is very important, it will save you a lot of time and money in building the workshop.
Below are steps in the process of building a factory
- Step 1: Survey and discuss your ideas and needs on the site.
- Step 2: Basic design of the facility as well as the location and area.
- Step 3: Design technical drawings before building workshops.
- Step 4: Construction of workshop
- Step 5: Checking and using the workshop